- Year: 2017
- Client: GUN Club Bogotá
- Project duration: 2 years
- Team: 3 people, General Management + Design Technology
- Capital: USD 8.333.000
- Used tools:
- Software: Rhino + Revit (BIM)
- Visual Programming: Grasshopper + Dynamo
- Programming Language: C#
- Microsoft Office Excel
About the project
During the Project Structuring and Pre-Feasibility stage, parametric modeling is required in two respects:
- The capacity of the lot according to the specific applicable legal frame, in this case
the POT (Territorial Planning Plan) 190 of 2000 (Bogotá), to evaluate the parameters
of Buildability and Uses. - The business model with the scheme of uses, costs and return on investment.
Additionally, since it is a complex declared Asset of District Cultural Interest, it is
necessary to develop a project to define the conditions of intervention and conservation of the complex, which must be adopted by the District Institute of Cultural Heritage.
The generative algorithm developed allows evaluating the different project scenarios (volumetric and implementation scheme, in addition to the business model) and approaching the definition of the best scenario through the convenience function or Fitness Function that best resolves the determinants.
The parameters of the algorithms have to do with the main evaluation indicators of the real estate project: volumetry, buildability, communal (equipment), technical, indicators (architectural efficiency), costs + charges (urban planning), business model and use scheme.
Back to index

Professional Portfolio
Access the downloadable PDF version of my professional portfolio.
- Year: 2024
- Client: Perry Associate Architects
- Project duration: 5 months (prototype)
- Team: 3 people, design technology + interns
- Success indicator: 85% reduction in area frame times
- Capital: USD 50,000 (investment in development)
- Used tools:
- Software BIM: Revit
- Visual Programming: Dynamo
- Programming Language: Phyton
- Microsoft Office Excel
About the project
During the project development stage, it is required to produce area plans and area charts that allow detailed monitoring of both the built areas and the private areas detailed by use. It is important that these tables are updated as the project evolves with advances and modifications to the plant layouts.
When working based on a federated model, and the integration methodology both in the site model and in the towers themselves with the different types of apartments, it is necessary to manage the links in the host model in Revit, to be able to manage the information in the integrated general floors and thus be able to produce tables of
general project areas.
This process requires the programmatic integration of information into the Revit model as required by the project team and the structuring team. With the management of information through the import of data from the links, and the generation of area plans, area boundary lines, and the area labels, data management permits export
to excel spreadsheets.
Back to index
- Year: 2017
- Client: Cremil - Armed Forces Retirement Fund – Colombia Armed Forces
- Project duration: 2 years
- Team: 15 people
. echeverrimontes - Leader
. National Development Finance – Financial Professionals
. IDOM – Engineering Consultants
. Deloitte – Market Analysis
. PGP – Legal Professional - Capital: USD 266.670.000
- Used tools:
- Software BIM: Revit
- Visual Programming: Grasshopper
- Programming Language: C#
- Microsoft Office Excel
About the project
During the Project Structuring and Pre-Feasibility stage, it is required to parametrically
model the same in two respects.
- The capacity of the lot according to the specific applicable legal frame, in this case the POT (Territorial Planning Plan) 190 of 2000 (Bogotá), to evaluate the parameters of Buildability and Uses.
- The business model with the scheme of uses, costs and return on investment
Additionally, since it is a complex declared a Site of National and District Cultural Interest, it is necessary to develop a PEMP Preservation Plan (Special Management and Protection Plan) to define the conditions of intervention and conservation of the complex, which must be adopted by the Ministry of Culture.
The generative algorithm developed allows evaluating the different project scenarios (volumetric and implementation scheme, in addition to the business model) and approaching the definition of the best scenario through the convenience function or Fitness Function that best resolves the determinants.
The parameters of the algorithm have to do with the main evaluation indicators of the real estate project: volumetry, buildability, communal (equipment), technical, indicators (architectural efficiency), costs + charges (urban planning), business model and use scheme.
Back to index
- Year: 2024
- Client: Perry Associate Architects
- Project duration: 3 months (prototype)
- Team: 3 people, design technology + interns
- Success indicator: 85% reduction in wall quantity quantification times
- Capital: USD 50,000 (investment in development)
- Used tools:
- Software BIM: Revit
- Visual Programming: Dynamo
- Programming Language: Python
About the project
During the budgeting stage, the need to quantify the elements that make up a model requires the management of data contained in the Revit database. Various coding methodologies (international standards) of Families,
Family Types and Instances are used to filter and organize the information, extract it from the model throughSchedules (Revit), Bills of Quantities in Excel or integration with budgeting software.
One of the most difficult elements to analyze and quantify is Family: Walls, since the budgets must discriminate the measurement in square meters and linear meters according to the quantification scheme of material, waste, labor or subcontracts.
This exercise is facilitated programmatically through the algorithm developed to automate the process, analyze the geometry of each wall according to selection by Family,
Family Type and Instance, and the calculation of long-overhead quantities in each case, discriminating linear walls (ml) , parapets (ml), lintels (ml), and complete panels (m2), according to their dimensions.
Back to index
- Client: Salgado Melendez
- Project duration: 8 months
- Team: 1 person, Design Technology, Architectural Heritage Component Specialist
- Capital: USD 3.236.317.506
- Used tools:
- Software: Rhino Visual
- Programming: Grasshopper
- Plugin: GHopperGIS (self-developed)
- Programming Language: C#
- Microsoft Office Excel
About the project
Studies and designs phase review. Metro Bogotá 1st line, approximately 24 kilometers, entirely elevated: Portal Américas Station and Calle 72 Station, sixteen (16) stations. Two zones have been defined for the analysis: 1. Area of Indirect Influence (IIA), with a general look at the BICs, in total 10 localities and 25 UPZs; 2. Area of Direct Influence (AID), which includes the blocks afferent to the route of the PLMB and three hundred meters in the station area.
Back to index
- Year: 2018
- Client: Santa Bárbara Urbanization - Santiago Restrepo
- Project duration: 6 months
- Team: 3 professional architects
- Capital: USD 50,000 - Project Structuring
- Used tools:
- Rhino
- Grasshopper
- Revit
- Microsoft Office - Project
About the project
The proposal developed for the Santa Bárbara urbanization, in the Cristales area in Cali (Colombia), is a joint offer between the UR Arquitectos office, led by architect Javier Uribe in Cali, and by architect Paula Echeverri Montes.
In this project we developed a housing proposal of 5 buildings of 5 floors each, with three sophisticated apartments: type one is approximately 137.70 m2, type 2 is 119.50 m2 and type three has measurements of 147.85 m2, this being one of the largest.
The structure highlights our holistic conception of design: through computational design and the use of BIM (Building Information Modeling), our clients can view, from any angle they wish, the design plane made from a frontal or zenithal axis.
The aesthetics and design were thought about the comfort of our clients, with the aim of creating appropriately modern and avant-garde spaces. Our interest as architects is to generate a serene and calm architecture, where the housing qualities are much superior in terms of the interior comfort of the apartments and allow a better quality of life.
Back to index

Professional Portfolio
Access my professional portfolio in a downloadable PDF version.
- Year: 2024
- Client: Perry Associate Architects
- Project duration: 6 months
- Team: 4 people, General Management + Design Technology, Financial Team
- Capital: $6,500
- Used tools:
- Software: Rhino
- Visual Programming: Grasshopper
- Programming Language: C#
- Microsoft Office Excel
About the project
The generative algorithm developed allows evaluating the different project scenarios (volumetric and implementation scheme, in addition to the business model) and approaching the definition of the best scenario through the convenience function or Fitness Function that best resolves the determinants.
The parameters of the algorithms have to do with the main evaluation indicators of the real estate project: volumetry, buildability, communal (equipment), technical, indicators (architectural efficiency), costs + charges (urban planning), business model and use scheme.
Back to index
- Year: 2019 - 2020
- Client: Structurers - Promoters / Own Development Project
- Project duration: 2 years
- Team:
- Business Model: Eulalia Arboleda
- Financial: Miguel Montes
- Lead Specialist: Roberto Arboleda
- Market Research: Retail & Intelligence SAS - Arturo Vergara Ortiz
- Architecture: Paula Echeverri Montes
- Capital: USD 60,000 - Project Structuring
- Used tools:
- Rhino
- Grasshopper
- Microsoft Office: Excel + Project
About the project
This project consisted of the design of a collaborative space appropriate for the professional practice of health specialists, who were interested in efficiently taking advantage of their availability of space and time.
In the design, the individual work areas of the professionals are complemented by shared use areas, and “collective” areas in which professionals can interact with their colleagues and their own and shared patients through interconsultation.
The objective of creating a collaborative space was to generate a community of professionals interested in taking advantage of the synergies generated by the interaction of different specialties in the treatment of their patients, and the consolidation of a clientele that is strengthened by the offer generated through the project.
Back to index
- Year: 2016-2017
- Client: Developers - Promoters / Own Development Project
- Project duration: 2 years
- Team:
- Business Model: Promoter Team
- Financial: Miguel Montes
- Lead Specialist: Mauricio Cajiao
- Architecture: Paula Echeverri Montes
- Capital: USD 30,000 - Project Structuring
- Used tools:
- Revit
- Microsoft Office Excel + Project
About the project
During the budgeting stage, the need to quantify the elements that make up a model requires the management of data contained in the Revit database. Various coding methodologies (international standards) of Families,
Family Types and Instances are used to filter and organize the information, extract it from the model throughSchedules (Revit), Bills of Quantities in Excel or integration with budgeting software.
One of the most difficult elements to analyze and quantify is Family: Walls, since the budgets must discriminate the measurement in square meters and linear meters according to the quantification scheme of material, waste, labor or subcontracts.
This exercise is facilitated programmatically through the algorithm developed to automate the process, analyze the geometry of each wall according to selection by Family,
Family Type and Instance, and the calculation of long-overhead quantities in each case, discriminating linear walls (ml) , parapets (ml), lintels (ml), and complete panels (m2), according to their dimensions.
Back to index
- Year: 2015
- Client: Structurers - Promoters / Own Development Project
- Project duration: 1 year
- Team: Paula Echeverri Montes + General Management
- Capital: USD 20.000
- Used tools:
- Rhino + Grasshopper
- Programming Language: C#
- Microsoft Excel
About the project
Since within the lots there is one declared Asset of District Cultural Interest, it is necessary to develop a project to define the conditions of intervention and conservation of the complex, which must be adopted by the District Institute of Cultural Heritage.
The algorithm developed allows evaluating the different project scenarios (volumetric and implementation scheme, in addition to the business model) and approaching the definition of the best scenario through the convenience function that best resolves the determinants.
The parameters of the algorithms have to do with the main evaluation indicators of the real estate project: volumetry, buildability, communal (equipment), technical, indicators (architectural efficiency), costs + charges (urban planning), business model and use scheme.
Back to index
- Year: 2013
- Client: Ministry of Culture
- Project duration: 1 month
- Team: Javier Cárdens + Paula Echeverri Montes
- Used tools:
- AutoCad
- Revit
- VRay
About the project
This project consisted of the intervention of 5 squares in the center of the city, the preservation of the urban texture while developing the complex for the Ministries within the Historic Center. The idea was to generate a varied volumetric complex both in plan as in section, with a multiplicity of textures and heights, that accounted to the existing context.
Back to index
- Year: 2014
- Client: Ministry of Culture
- Project duration: 1 month
- Team: Paula echeverri Montes / Javier Cárdenas
- Capital: USD 30,000 - Project Structuring
- Used tools:
- Revit
- VRay
- 3d Max
- Microsoft Office: Excel + Project
About the project
The project consisted of the design for a monumental building in the memory of those victims of the armed conflict in Colombia. The building was to be situated in one of the main avenues of the modern city of Bogotá, in the intersection of two main avenues.
The architectonic proposal aimed at the memory of those lost and the space for reflection of those that still are..
Back to index
#13
Interior Design
Apartments Bogotá
Architectural design
- Year: 2014
- Client: Ministry of Culture
- Project duration: 1 month
- Team: Paula echeverri Montes + Javier Cárdenas
- Capital: USD 400.000
- Used tools:
- Revit
- VRay
- 3d Max
- Microsoft Office: Excel + Project
About the project
The interior design of two apartments in a residential building in Bogotá, which presented a unique opportunity to blend modern aesthetics with the cultural and environmental nuances of the Colombian capital. Bogotá, known for its rich history and diverse architecture, provides a vibrant backdrop that can influence the interior spaces within these apartments.
Back to index
- Year: 2014
- Client: Ministry of Culture
- Project duration: 1 month
- Team: Paula echeverri Montes + Javier Cárdenas
- Capital: USD 700.000
- Used tools:
- Revit
- VRay
- 3d Max
- Microsoft Office: Excel + Project
About the project
The work we did for the Rodríguez Building in Bogotá involved a delicate balance between modern design innovation and the preservation of historical architectural elements. This intervention sought to enhance the building’s functionality and aesthetic appeal while respecting and retaining its original character. Thus, the project required a careful approach to integrate contemporary architectural solutions that meet current needs, without compromising the cultural and historical integrity of the structure. By blending modern interventions with traditional preservation techniques, the Rodríguez Building was revitalized to serve as a functional and vibrant space that honors its historical significance while embracing the future.
.
Back to index